Dr. Ir. Alfa Taras Bulba, ST, M.Sc
Tentang Saya (About Me)
Alfa Taras bulba, ST, M.Sc
School of Civil Engineering
University Syiah Kuala, Banda Aceh, Aceh
cp. 08126995621
Email. alfatarasbulba@unsyiah.ac.id
Banda Aceh, August 9, 1982.
Academic . Sarjana Teknik Sipil, Universitas Sumatera Utara, Medan, Indonesia.
Qualification (Transportation)
. Master Degree Project Management, Universiti Sains of Malaysia, Penang,
Malaysia (Project Management)
Status . Civil Engineer Lecturer at Engineer Department faculty University Syiah Kuala.
Area of interest . Construction Management . Construction Legal Aspect
. Value Management . Project Schedule
. Cost Estimation . Risk Management
. Heavy Equipment Technic . Contract
Application expertise area are:
1. Road construction Project
2. Building and Housing construction Project
3. Site preparation ( cut and fill ) Project
4. Revetment, Retention Basin and Drainage Construction Project
5. Asphalt Mixing Plant Operation and Productivity
6. Heavy Equipment Operation and Productivity
7. Contractual Selection based on Project Applied
8. Construction Procurement
9. Schedule and Cost Construction Applied
Experience based on.
1. Contractor perspective
2. Monitoring Consultant Perspective
3. Support Staff Government for Monitoring and Evaluaition Project
Publikasi (Publications)
Jurnal (Journals)
Teuku Arif Billah, Abdullah Abdullah, Alfa Taras Bulba, 2023, Analisis Faktor-Faktor Yang Mempengaruhi Triple Constraints Proyek Konstruksi Gedung Di Provinsi Aceh Dalam Masa Pandemi Covid 19, Teras Jurnal, Vol. 1, 99-112, p-ISSN 2088-0561; e- ISSN 2502-1680.
Jihan Dara Muthia, Cut Zukhrina Oktaviani, Alfa Taras Bulba, 2023, Persepsi Kontraktor Terhadap Faktor Penyebab Keterlambatan Pembayaran Termin Di Kota Banda Aceh, JUTEKS : Jurnal Teknik Sipil, Vol. 8, 50-56, 2621-9786.
M. Arif Nugraha, Cut Zukhrina Oktaviani, Alfa Taras Bulba, 2022, Pengaruh Keterlambatan Proses Pengadaan Tanah Terhadap Pencapaian Waktu Proyek, Jurnal Arsip Rekayasa Sipil dan Perencanaan (JARSP), Vol. 5, , e-ISSN 2615-1340; p-ISSN 2620-7567.
Hartawan Chandra Nst, Cut Zukhrina Oktaviani, Alfa Taras Bulba, 2022, Implementation of Quality Management System Performance by Batching Plant Service Provider in Kabupaten Aceh Besar, Journal of World Science, , , p-ISSN 2828-8726; e-ISSN 2828-9307.
Alfa Taras Bulba, Anita Rauzana, Ikhlas Kurniawan, 2022, Identifikasi Risiko Biaya Pelaksanaan Proyek Konstruksi Gedung Bagi Perusahaan Kontraktor, Jurnal Teknik Sipil dan Teknologi Konstruksi , Vol. 8, , e-ISSN 2502-051X; p-ISSN 2477-5258.
Ahmad Irvan Antony Has, Renni Anggraini, Alfa Taras Bulba, 2021, Isue Aksesibilitas dan Pengembangan Wilayah Sebagai Kriteria Penentu Prioritas Peningkatan Jalan di Kabupaten Pidie Jaya, Teras Jurnal, Vol. 1, , p-ISSN 2088-0561; e- ISSN 2502-1680.
Yusril Mahendra, Renni Anggraini, Alfa Taras Bulba, 2021, Prioritas Peningkatan Jalan di Kabupaten Pidie Jaya Berbasis Analytical Hierarchy Process (AHP), Teras Jurnal, Vol. 1, , p-ISSN 2088-0561; e- ISSN 2502-1680.
Khuzul Hidayat, Nurul Malahayati, Alfa Taras Bulba, 2021, Identifikasi Risiko Oleh Pengembang Perumahan di Kota Banda Aceh dan Kabupaten Aceh Besar, Journal of The Civil Engineering Student, Vol. 3, , 2685-0605.
Alfa Taras Bulba, Muammar Zaki Fahlewi, 2014, Faktor Dominan Penentuan Pemenang Lelang Pada Sistem Gugur Di Kota Banda Aceh, Jurnal Teknik Sipil, Volume, 131 - 142, 2088-9321.
Mubarak, Alfa Taras Bulba, Mega Yunita, 2014, Studi Nilai Produktivitas Pekerjaan Pondasi Bored Pile, Jurnal Teknik Sipil, Volume, 199-208, 2088-9321.
Prosiding (Proceedings)
Ikhlas Kurniawan, Anita Rauzana, Alfa Taras Bulba, 2022, The Correlation of Finacial Risk Variables on Project Construction Budget Infrastructure in Aceh, AIP Conference Proceedings, , , , , , 020068, .
Nurisra, Alfa Taras Bulba, Cut Zukhrina Oktaviani, 2020, Proporsi Komponen Biaya Material Dan Upah Tenaga Kerja Pada Bangunan Gedung Tidak Sederhana Di Aceh, Prosiding Simposium Nasional Teknik Sipil ke-2 (SIMNATEKS), , , , , , , 978-623-95727-0-9.
Alfa Taras Bulba, Abu Hassan Abu Bakar, 2019, Effect Of LSMC on National Road-Contractor Performance in Aceh, Indonesia, The European Proceedings of Multidisciplinary Sciences EpMS, The European Proceedings of Multidisciplinary Sciences EpMS, , , , Future Academy, 555-560, 2421-826X.
Tripoli, Alfa Taras Bulba, Fachrurrazi dan Cut Annisa Widyasari Mastura, 2016, Identifikasi Terjadinya Risiko Keterlambatan Pelaksanaan Pada Proyek Konstruksi di Provinsi Aceh, Konferensi Nasional Teknik Sipil 10, Konferensi Nasional Teknik Sipil 10, , , , , , 9786026028600.
Nurisra, Alfa Taras Bulba, Febriyanti Maulina, 2015, Faktor-faktor yang Mempengaruhi Contingency Cost Pada Proyek pembangunan Gedung di Banda Aceh, Peran Inovasi Rekayasa Konstruksi Dalam Pembangunan Aceh Yang Berkelanjutan, Seminar Nasional "Peran Inovasi Rekayasa Konstruksi Dalam Pembangunan Aceh Yang Berkelanjutan", Banda Aceh, 4 Juni 2015, Banda Aceh, Jurusan Teknik Sipil, Ikatan Alumni Teknik Sipil (IKATSI), Fakultas Teknik Universitas Syiah Kuala, , 2086-5244.
Buraida, Alfa Taras Bulba, 2015, Hubungan karakteristik Dengan Motivasi Tenaga Kerja Pada Proyek Rusunawa Kota Banda Aceh, Peran Inovasi Rekayasa Konstruksi Dalam Pembangunan Aceh Yang Berkelanjutan, Seminar Nasional "Peran Inovasi Rekayasa Konstruksi Dalam Pembangunan Aceh Yang Berkelanjutan", Banda Aceh, 4 Juni 2015, Banda Aceh, Jurusan Teknik Sipil, Ikatan Alumni Teknik Sipil (IKATSI), Fakultas Teknik Universitas Syiah Kuala, 0, 2086-5244.
Cut Zukhrina Oktaviani, Alfa Taras Bulba, 2011, Hubungan Kerjasama Kontraktor Dan Supplier Pada Proyek Konstruksi, Peranan Teknologi Dalam Peningkatan Kualitas Masyarakat, Seminar Nasional Ke 3 Teknologi Dan Rekayasa FT UISU, Medan, 26-29 April 2011, Medan, FT UISU, , 978-602-96853-1-2.

alfatarasbulba@usk.ac.id
-